Reduce equipment wiring by integrating systems that were previously configured by multiple networks into CC-Link IE TSN/CC-Link IE Field.
Increase system configuration flexibility and reduce wiring costs by building an optimal network that connects PLCs, servo amplifiers, and inverters on a single network suitable for an application.
Integrate distributed control, I/O control, and motion control while having information communication with IT systems mixed.
Key Points
- Configure a flexible system with various devices.
- Build flexible wiring according to the system layout.